Lean Construction and the Last Planner System
A practical course for site managers, planners, engineers, foremen and subcontractor supervisors on construction, EPC and oil and gas projects. Learn why a site needs its own form of Lean, how to run each level of the Last Planner System from pull planning and constraint logs to weekly commitments, daily huddles and Percent Plan Complete, and how to plan repetitive work in takt zones. It also covers prefabrication, the Lean site, collaborative contracts, target value design and how to introduce the method on a project; it awards no belt or certification.
- Module
- 8
- Max. Teilnehmende
- 20
- Sprache
- EN
Was sie üblicherweise umfasst
- 1
Why Construction Needs Its Own Lean
- Construction as a Temporary Production System
- Variability, Many Trades and Unreliable Plans
- The Wastes of a Construction Site
- Transformation, Flow and Value
- 2
The Last Planner System: Origins and Structure
- The Lean Construction Institute and the Origin of the Last Planner System
- Should, Can, Will, Did
- The Levels of the Last Planner System
- The People of the Last Planner System
- 3
Master Schedule and Phase (Pull) Planning
- The Master Schedule and Its Milestones
- Why Phases Are Pulled, Not Pushed
- Running a Pull Planning Session Step by Step
- When Pull Planning Goes Wrong
- 4
Lookahead Planning and Making Work Ready
- The Lookahead Window
- Constraint Analysis
- The Constraint Log
- Making Ready: Screening, Pulling and the Workable Backlog
- Worked Case: Making Ready an Instrument Package
- 5
Weekly Work Planning, Daily Huddles and PPC
- The Weekly Work Planning Meeting
- Sound Assignments and the Quality Criteria for a Commitment
- Daily Huddles
- Percent Plan Complete (PPC)
- Reasons for Non-Completion and Learning from Them
- 6
Takt Planning and Location-Based Scheduling
- Takt Planning in Construction
- Worked Example: A Takt Plan for Accommodation Floors
- Takt Control on Site
- Location-Based Scheduling and Flowlines
- 7
The Lean Site
- Prefabrication and Modular Construction
- 5S and Visual Management on Site
- Lean and Safety on Site
- Worked Case: One Week on the Pipe Rack
- 8
The Lean Project and Getting Started
- Integrated Project Delivery and Collaborative Contracts
- Target Value Design
- Building Information Modelling and Lean
- Introducing the Last Planner System on a Project
- Sustaining the System and Measuring Beyond PPC
Diese Seite beschreibt, was die Schulung üblicherweise umfasst. Jeder Schulungsanbieter kann Inhalt, Dauer und Reihenfolge an die Gruppe anpassen. Klären Sie den endgültigen Inhalt mit dem Schulungsanbieter, bevor Sie buchen.
Lieber im eigenen Tempo lernen?
Dasselbe Thema als Onlinekurs, den Sie heute beginnen können.

Lean Construction and the Last Planner System
7 Std. 12 Min.
Mehr aus Projektmanagement
Weitere Kurse mit Lehrkraft aus demselben Fachgebiet.
Bewertungen
Was Lernende über Lean Construction and the Last Planner System sagen.
Noch keine Bewertungen
Noch hat niemand gesagt, wie Lean Construction and the Last Planner System war. Machen Sie den Anfang.
Melden Sie sich an, um eine zu schreiben. Wir prüfen jede Bewertung, bevor sie angezeigt wird.
Jetzt buchen
Haben Sie gefunden, wonach Sie gesucht haben?
Kontaktieren Sie unser Team, um Kurs und freie Plätze an Ihrem bevorzugten Ort zu prüfen
Jetzt buchen
