Temporary Pipework Safety
An awareness course for rig crews, well service crews, plant operators and supervisors who rig up, pressure test, work near or rig down temporary high-pressure pipework and hoses. It covers how pressurised lines injure people, the components and hammer unions including the 2 inch Fig 602 and Fig 1502 mismatch, ratings and inspection, restraints, pressure testing, safe operation, proving zero pressure and rig-down. It does not qualify anyone to design, inspect or certify pressure equipment; ratings, test pressures and intervals always come from the manufacturer and company procedure.
- Module
- 7
- Max. Teilnehmende
- 20
- Sprache
- EN
Was sie üblicherweise umfasst
- 1
Temporary Pipework and Why It Hurts People
- What Temporary Pipework Is and Where It Is Used
- Stored Pressure Energy: Liquid and Gas
- How Temporary Pipework Injures People
- What Attacks the Line: Erosion, Corrosion, Vibration and Shock
- Roles, Responsibilities and Stop Work
- 2
Components of a Temporary Line
- Straights, Pup Joints, Elbows and Swivel Joints
- Tees, Laterals, Crossovers and Blanked Outlets
- Plug Valves, Check Valves and Chokes
- Pressure Relief Valves, Gauges and Sensors
- Flexible High-Pressure Hoses
- 3
Hammer Unions and Other Connections
- The Parts of a Hammer Union
- Figure Numbers, Ratings and Colour Coding
- The 2 Inch Fig 602 and Fig 1502 Mismatch
- Other Mismatches and How to Prevent Them
- Threaded, Integral, Flanged and Hub Connections
- 4
Ratings, Identification and Inspection
- Working Pressure, Test Pressure and the Weakest Component
- Temperature and Service: Standard, Sour and Abrasive
- Identification, Banding and Certification
- Pre-Use Inspection and Rejection Criteria
- 5
Rigging Up the Line
- Planning the Layout
- Supports, Restraints and Anchoring
- Making Up Hammer Unions Safely
- Walking the Line Before Pressure
- 6
Pressure Testing, Operating and Rigging Down
- Preparing a Pressure Test
- Running the Test: Stages, Hold and Records
- Operating: Line of Fire, Monitoring and Leaks
- Depressurising and Proving Zero Energy
- Rig-Down, Cleaning and Storage
- 7
Putting It Together: Cases and the Complete Job
- Case: A Mismatched Union on a Cementing Line
- Case: A Washout During Flowback
- Case: Trapped Pressure at Rig-Down
- The Complete Job, Start to Finish
Diese Seite beschreibt, was die Schulung üblicherweise umfasst. Jeder Schulungsanbieter kann Inhalt, Dauer und Reihenfolge an die Gruppe anpassen. Klären Sie den endgültigen Inhalt mit dem Schulungsanbieter, bevor Sie buchen.
Lieber im eigenen Tempo lernen?
Dasselbe Thema als Onlinekurs, den Sie heute beginnen können.

Temporary Pipework Safety
4 Std. 18 Min.
Mehr aus Öl und Gas
Weitere Kurse mit Lehrkraft aus demselben Fachgebiet.
Bewertungen
Was Lernende über Temporary Pipework Safety sagen.
Noch keine Bewertungen
Noch hat niemand gesagt, wie Temporary Pipework Safety war. Machen Sie den Anfang.
Melden Sie sich an, um eine zu schreiben. Wir prüfen jede Bewertung, bevor sie angezeigt wird.
Jetzt buchen
Haben Sie gefunden, wonach Sie gesucht haben?
Kontaktieren Sie unser Team, um Kurs und freie Plätze an Ihrem bevorzugten Ort zu prüfen
Jetzt buchen
