Quick Changeover (SMED)
A practical course on single-minute exchange of die (SMED) for production engineers, maintenance technicians, setters and supervisors in factories, packaging lines, process plants and workshops. Learn to measure and film a changeover, separate internal and external work, convert and streamline what remains, run a SMED workshop with isolation and lockout kept in place, and handle cleaning and allergen changeovers. It ends with standardising the new method, measuring it, and using the saved time in OEE and scheduling; it does not award a belt or certificate.
- Modules
- 8
- Participants max.
- 20
- Langue
- EN
Ce qu'elle couvre habituellement
- 1
Why Changeover Time Matters
- What a Changeover Is and What This Course Covers
- Changeover Time, Batch Size and Inventory
- Worked Example: Time Saved and Capacity Freed
- Flexibility, Lead Time and the Customer
- Shigeo Shingo and the Origin of SMED
- 2
Defining and Studying the Current Changeover
- Defining Changeover Time: Last Good Part to First Good Part
- The Four Phases of a Changeover
- Planning the Study and Filming the Changeover
- Breaking the Changeover into Elements
- Choosing the Machine and Setting a Target
- 3
Stage 1: Separating Internal and External Work
- Internal and External Elements
- Classifying the Elements and the First Result
- Changeover Checklists and Function Checks
- Kits, Tool Carts and Staging Areas
- 4
Stage 2: Converting Internal Work to External
- Seeing the True Function of Each Internal Element
- Preparing Operating Conditions in Advance
- Function Standardisation: Common Heights and Interfaces
- Intermediate Jigs, Sub-Plates and Off-Line Assembly
- 5
Stage 3: Streamlining Internal and External Work
- Parallel Operations and Safe Coordination
- Functional Clamps: One-Turn and Quarter-Turn Fasteners
- Eliminating Adjustment: Locators, Stops and Fixed Settings
- Pre-set Tooling and the Streamlined Result
- Streamlining External Work and When to Mechanise
- 6
Running a SMED Workshop Safely
- The SMED Workshop Step by Step
- The Team, the Roles and the Shop Floor
- Safety During Changeover: Isolation and Lockout
- When the Method Changes, the Risk Changes
- Case Study: A Workshop on the Press
- 7
Changeovers in Process, Packaging and Food Industries
- Grade and Product Changes in Process Plants
- Format Changes and Line Clearance on Packaging Lines
- Cleaning as Part of the Changeover
- Allergen Changeovers: A Recap
- 8
Sustaining the Gain: Standards, Measures, OEE and Scheduling
- Standardising the New Changeover
- Measuring Changeover Performance
- Changeovers and Overall Equipment Effectiveness
- Scheduling, Lot Size and Levelling
- Building Your Changeover Improvement Plan
Cette page décrit ce que la formation couvre habituellement. Chaque prestataire de formation peut modifier le contenu, la durée et l'ordre pour s'adapter au groupe. Confirmez le contenu final avec le prestataire de formation avant de réserver.
Vous préférez apprendre à votre rythme ?
Le même sujet en cours en ligne, à commencer dès aujourd'hui.

Changement rapide d'outil (SMED)
7 h 54 min
Autres cours : Management de la qualité
Autres cours avec un formateur dans le même domaine.
Avis
Ce que les apprenants disent de Quick Changeover (SMED).
Pas encore d'avis
Soyez la première personne à dire ce que vous avez pensé de Quick Changeover (SMED).
Connectez-vous pour en rédiger un. Nous vérifions chaque avis avant de l'afficher.
Réserver
Est-ce ce que vous cherchiez ?
Contactez notre équipe pour vérifier la disponibilité du cours et des places dans le lieu de votre choix
Réserver


