Total Productive Maintenance (TPM) and OEE
A practical course for maintenance and production supervisors, engineers and reliability staff on total productive maintenance (TPM) and overall equipment effectiveness (OEE). Learn to measure the six big losses, calculate OEE and TEEP correctly and avoid the ways the figure misleads, run autonomous maintenance with operators safely, and plan a TPM pilot with the other pillars. It is awareness and practitioner training and does not award any TPM certificate or award.
- Modules
- 7
- Participants max.
- 20
- Langue
- EN
Ce qu'elle couvre habituellement
- 1
Orientation: What TPM Is and Why It Matters
- What Total Productive Maintenance Is
- Where TPM Came From
- Losses, Deterioration and Ownership: The TPM Way of Thinking
- How TPM Fits with Maintenance Strategy, Reliability and Lean
- 2
The Six Big Losses
- From Calendar Time to Fully Productive Time
- Availability Losses: Breakdowns and Setups
- Performance Losses: Minor Stops and Reduced Speed
- Quality Losses: Process Defects and Start-up Rejects
- Recording Losses on the Shop Floor
- 3
Calculating OEE
- OEE Definitions: Planned Production Time, Run Time, Ideal Cycle Time and Good Count
- Availability, Performance and Quality, Step by Step
- The Simple Formula and the Cross-Check
- Mixed Products and Different Cycle Times
- TEEP and Loading
- 4
Using OEE Well
- Benchmarks and the "World-Class" Figure
- How OEE Gets Gamed
- Comparing Lines and Sites
- From OEE to Action: Loss Trees and Pareto Charts
- MTBF and MTTR on the Shop Floor
- 5
The TPM Pillars
- The Pillar Model as It Is Commonly Taught
- Focused Improvement
- Planned Maintenance within TPM
- Quality Maintenance
- Early Equipment Management
- Training, Safety and Office TPM
- 6
Autonomous Maintenance
- The Seven Steps of Autonomous Maintenance
- Initial Cleaning Is Inspection
- Tagging Abnormalities
- Contamination Sources and Cleaning, Inspection and Lubrication Standards
- Safety When Operators Touch Equipment
- The Operator–Maintenance Partnership
- 7
Implementing TPM
- The Steering Group and the Master Plan
- Choosing Pilot Equipment
- Measuring Progress: Beyond the OEE Figure
- Case: A TPM Pilot on a Packing Line
- Sustaining TPM and Next Steps
Cette page décrit ce que la formation couvre habituellement. Chaque prestataire de formation peut modifier le contenu, la durée et l'ordre pour s'adapter au groupe. Confirmez le contenu final avec le prestataire de formation avant de réserver.
Vous préférez apprendre à votre rythme ?
Le même sujet en cours en ligne, à commencer dès aujourd'hui.

Maintenance productive totale (TPM) et TRS
7 h 12 min
Autres cours : Génie mécanique
Autres cours avec un formateur dans le même domaine.
Avis
Ce que les apprenants disent de Total Productive Maintenance (TPM) and OEE.
Pas encore d'avis
Soyez la première personne à dire ce que vous avez pensé de Total Productive Maintenance (TPM) and OEE.
Connectez-vous pour en rédiger un. Nous vérifions chaque avis avant de l'afficher.
Réserver
Est-ce ce que vous cherchiez ?
Contactez notre équipe pour vérifier la disponibilité du cours et des places dans le lieu de votre choix
Réserver


