Temporary Pipework Safety
An awareness course for rig crews, well service crews, plant operators and supervisors who rig up, pressure test, work near or rig down temporary high-pressure pipework and hoses. It covers how pressurised lines injure people, the components and hammer unions including the 2 inch Fig 602 and Fig 1502 mismatch, ratings and inspection, restraints, pressure testing, safe operation, proving zero pressure and rig-down. It does not qualify anyone to design, inspect or certify pressure equipment; ratings, test pressures and intervals always come from the manufacturer and company procedure.
- मॉड्यूल
- 7
- अधिकतम छात्र
- 20
- भाषा
- EN
इसमें आम तौर पर क्या शामिल है
- 1
Temporary Pipework and Why It Hurts People
- What Temporary Pipework Is and Where It Is Used
- Stored Pressure Energy: Liquid and Gas
- How Temporary Pipework Injures People
- What Attacks the Line: Erosion, Corrosion, Vibration and Shock
- Roles, Responsibilities and Stop Work
- 2
Components of a Temporary Line
- Straights, Pup Joints, Elbows and Swivel Joints
- Tees, Laterals, Crossovers and Blanked Outlets
- Plug Valves, Check Valves and Chokes
- Pressure Relief Valves, Gauges and Sensors
- Flexible High-Pressure Hoses
- 3
Hammer Unions and Other Connections
- The Parts of a Hammer Union
- Figure Numbers, Ratings and Colour Coding
- The 2 Inch Fig 602 and Fig 1502 Mismatch
- Other Mismatches and How to Prevent Them
- Threaded, Integral, Flanged and Hub Connections
- 4
Ratings, Identification and Inspection
- Working Pressure, Test Pressure and the Weakest Component
- Temperature and Service: Standard, Sour and Abrasive
- Identification, Banding and Certification
- Pre-Use Inspection and Rejection Criteria
- 5
Rigging Up the Line
- Planning the Layout
- Supports, Restraints and Anchoring
- Making Up Hammer Unions Safely
- Walking the Line Before Pressure
- 6
Pressure Testing, Operating and Rigging Down
- Preparing a Pressure Test
- Running the Test: Stages, Hold and Records
- Operating: Line of Fire, Monitoring and Leaks
- Depressurising and Proving Zero Energy
- Rig-Down, Cleaning and Storage
- 7
Putting It Together: Cases and the Complete Job
- Case: A Mismatched Union on a Cementing Line
- Case: A Washout During Flowback
- Case: Trapped Pressure at Rig-Down
- The Complete Job, Start to Finish
यह पेज बताता है कि इस प्रशिक्षण में आम तौर पर क्या शामिल होता है। हर प्रशिक्षण प्रदाता समूह के अनुसार सामग्री, अवधि और क्रम बदल सकता है। बुक करने से पहले प्रशिक्षण प्रदाता से अंतिम सामग्री की पुष्टि करें।
अपनी गति से सीखना पसंद है?
यही विषय एक ऑनलाइन कोर्स में, जिसे आप आज ही शुरू कर सकते हैं।

अस्थायी पाइपवर्क सुरक्षा
4 घं 18 मि
तेल और गैस में और कोर्स
इसी विषय के प्रशिक्षक वाले अन्य कोर्स।
समीक्षाएँ
Temporary Pipework Safety के बारे में शिक्षार्थी क्या कहते हैं।
अभी कोई समीक्षा नहीं
सबसे पहले बताएँ कि Temporary Pipework Safety कैसा था।
समीक्षा लिखने के लिए साइन इन करें। दिखाने से पहले हम हर समीक्षा जाँचते हैं।
अभी बुक करें
क्या यही वह है जिसकी आपको तलाश थी?
अपने पसंदीदा स्थान पर कोर्स और सीटों की उपलब्धता जाँचने के लिए हमारी टीम से संपर्क करें
अभी बुक करें
