Sınıf içi · EğitmenliPetrol ve GazOrtaSertifika
Plugging and Abandonment (P&A)
An intermediate course for well engineers, well integrity engineers, supervisors, decommissioning teams and regulator liaison staff on permanently and temporarily abandoning oil and gas wells. It covers the well barrier philosophy, well status review, P&A phases, barrier materials and placement techniques, verification, rigless and rig-based execution, HSE, cost, records and long-term liability, with reference to NORSOK D-010 and the OEUK Well Decommissioning Guidelines.
- Süre
- Her sağlayıcı belirler
- Seviye
- Orta
- Dil
- English
- Modüller
- 7
- En fazla katılımcı
- 20
- Puan
- Henüz puan yok
- İlk yorumu siz yazın
Sektörler
Genellikle neleri kapsar
- 1
Why Wells Are Plugged and Abandoned
- What Plugging and Abandonment Means
- Why Wells Reach the End of Their Life
- Permanent Abandonment, Temporary Abandonment and Suspension
- Regulations and Standards for Well Decommissioning
- Roles and Responsibilities in a P&A Project
- 2
The Well Barrier Philosophy
- Well Barriers and Well Barrier Elements
- Primary, Secondary and Open Hole to Surface Barriers
- Requirements for a Permanent Barrier Material
- Placing a Barrier: Full Cross-Section and Formation Strength
- Identifying Sources of Inflow and Cross-Flow
- 3
Well Status Review and Planning
- Gathering the Well History
- Evaluating Cement Behind Casing
- Annulus Pressures and Sustained Casing Pressure
- Assessing Access and Well Condition
- Building the Abandonment Programme
- 4
P&A Phases, Barrier Materials and Cement Placement
- The Three Phases of P&A
- Cement as a Permanent Barrier Material
- Alternative Barrier Materials
- Placing Balanced Cement Plugs
- Cement Retainers and Squeeze Cementing
- 5
Reaching the Annulus and Verifying Barriers
- Casing Cutting and Pulling
- Section Milling
- Perforate, Wash and Cement
- Tagging and Pressure Testing Barriers
- Logging Behind Casing and Barrier Acceptance
- 6
Executing P&A Work Safely and Efficiently
- Rig-Based, Rigless and Vessel-Based P&A
- Coiled Tubing and Wireline in P&A
- Wellhead Removal and Seabed Clearance
- Health, Safety and Environmental Considerations
- Cost Drivers and Campaign Planning
- 7
Closing Out and Applying P&A Judgement
- Records and Handover to the Authorities
- Long-Term Liability for Abandoned Wells
- Case Study: Abandoning an Old Platform Well
- Case Study: Problems Found During Execution
- The Complete P&A Picture
Bu sayfa, eğitimin genellikle neleri kapsadığını anlatır. Her eğitim sağlayıcı içeriği, süreyi ve sırayı gruba göre değiştirebilir. Rezervasyon yapmadan önce son içeriği eğitim sağlayıcıyla teyit edin.
Kazanacağınız beceriler
Bu kursu bitirmek, gösterilen seviyede bu becerilere sayılır.
Kendi hızınızda öğrenmeyi mi tercih edersiniz?
Aynı konu, bugün başlayabileceğiniz bir çevrimiçi kurs olarak.

Plugging and Abandonment (P&A)
7 sa 28 dk
ÜcretsizKursu görüntüle
Diğer kurslar: Petrol ve Gaz
Aynı konu alanında eğitmenli diğer kurslar.
Yorumlar
Öğrenenlerin Plugging and Abandonment (P&A) hakkında söyledikleri.
Henüz yorum yok
Plugging and Abandonment (P&A) hakkında ilk yorumu yapan siz olun.
Yorum yazmak için giriş yapın. Her yorumu gösterilmeden önce kontrol ederiz.
Hemen rezervasyon yapın
Aradığınız bu mu?
Tercih ettiğiniz konumda kursu ve yer durumunu öğrenmek için ekibimizle iletişime geçin
Hemen rezervasyon yapın
