Temporary Pipework Safety

An awareness course for rig crews, well service crews, plant operators and supervisors who rig up, pressure test, work near or rig down temporary high-pressure pipework and hoses. It covers how pressurised lines injure people, the components and hammer unions including the 2 inch Fig 602 and Fig 1502 mismatch, ratings and inspection, restraints, pressure testing, safe operation, proving zero pressure and rig-down. It does not qualify anyone to design, inspect or certify pressure equipment; ratings, test pressures and intervals always come from the manufacturer and company procedure.

Modüller
7
En fazla katılımcı
20
Dil
EN

Genellikle neleri kapsar

  1. 1

    Temporary Pipework and Why It Hurts People

    • What Temporary Pipework Is and Where It Is Used
    • Stored Pressure Energy: Liquid and Gas
    • How Temporary Pipework Injures People
    • What Attacks the Line: Erosion, Corrosion, Vibration and Shock
    • Roles, Responsibilities and Stop Work
  2. 2

    Components of a Temporary Line

    • Straights, Pup Joints, Elbows and Swivel Joints
    • Tees, Laterals, Crossovers and Blanked Outlets
    • Plug Valves, Check Valves and Chokes
    • Pressure Relief Valves, Gauges and Sensors
    • Flexible High-Pressure Hoses
  3. 3

    Hammer Unions and Other Connections

    • The Parts of a Hammer Union
    • Figure Numbers, Ratings and Colour Coding
    • The 2 Inch Fig 602 and Fig 1502 Mismatch
    • Other Mismatches and How to Prevent Them
    • Threaded, Integral, Flanged and Hub Connections
  4. 4

    Ratings, Identification and Inspection

    • Working Pressure, Test Pressure and the Weakest Component
    • Temperature and Service: Standard, Sour and Abrasive
    • Identification, Banding and Certification
    • Pre-Use Inspection and Rejection Criteria
  5. 5

    Rigging Up the Line

    • Planning the Layout
    • Supports, Restraints and Anchoring
    • Making Up Hammer Unions Safely
    • Walking the Line Before Pressure
  6. 6

    Pressure Testing, Operating and Rigging Down

    • Preparing a Pressure Test
    • Running the Test: Stages, Hold and Records
    • Operating: Line of Fire, Monitoring and Leaks
    • Depressurising and Proving Zero Energy
    • Rig-Down, Cleaning and Storage
  7. 7

    Putting It Together: Cases and the Complete Job

    • Case: A Mismatched Union on a Cementing Line
    • Case: A Washout During Flowback
    • Case: Trapped Pressure at Rig-Down
    • The Complete Job, Start to Finish

Bu sayfa, eğitimin genellikle neleri kapsadığını anlatır. Her eğitim sağlayıcı içeriği, süreyi ve sırayı gruba göre değiştirebilir. Rezervasyon yapmadan önce son içeriği eğitim sağlayıcıyla teyit edin.

Kod
Tür
Sınıf içi
Modüller
7
Beceri seviyesi
Başlangıç
Dil
EN
En fazla katılımcı
20
Sertifika
Evet
Değerlendirme
Hayır

Kendi hızınızda öğrenmeyi mi tercih edersiniz?

Aynı konu, bugün başlayabileceğiniz bir çevrimiçi kurs olarak.

Diğer kurslar: Petrol ve Gaz

Aynı konu alanında eğitmenli diğer kurslar.

Yorumlar

Öğrenenlerin Temporary Pipework Safety hakkında söyledikleri.

Henüz yorum yok

Temporary Pipework Safety hakkında ilk yorumu yapan siz olun.

Yorum yazmak için giriş yapın. Her yorumu gösterilmeden önce kontrol ederiz.

Hemen rezervasyon yapın

Aradığınız bu mu?

Tercih ettiğiniz konumda kursu ve yer durumunu öğrenmek için ekibimizle iletişime geçin

Hemen rezervasyon yapın
Image for the book now section

Teklif al