Cementing Operations
A practical intermediate course in primary and remedial well cementing for cementing crews, service technicians, drilling engineers, drilling supervisors and well integrity staff. It covers oilwell cement to API Spec 10A, slurry design and additives, laboratory testing to API RP 10B, volume and pressure calculations, mud removal and centralisation, equipment and the job sequence, cement evaluation, squeezes and balanced plugs, and common failures including the lessons of the Macondo cement job.
- Módulos
- 7
- Máximo de participantes
- 20
- Idioma
- EN
Qué suele abarcar
- 1
Primary Cementing and the Well
- Why We Cement a Well
- Casing Cement as a Well Barrier Element
- Casing Strings and Their Cement Jobs
- Pressures That Shape a Cement Job
- Who Does What on a Cement Job
- 2
Oilwell Cement and Slurry Properties
- Portland Cement and Hydration
- API Spec 10A Classes and Grades
- Density, Yield and Mix Water
- Thickening Time, Strength, Fluid Loss and Free Water
- Rheology of Cement Slurries
- 3
Additives and Laboratory Testing
- Accelerators and Retarders
- Extenders and Weighting Agents
- Fluid Loss, Dispersants and Lost Circulation Materials
- Gas Migration Control
- Laboratory Testing to API RP 10B
- 4
Job Planning and Calculations
- Capacities of Pipe, Hole and Annulus
- Slurry Volume: Excess, Lead, Tail and Shoe Track
- Displacement Volume and the Plug Bump
- Pressures During the Job: ECD and U-Tubing
- Spacers and Washes
- 5
Mud Removal and Cementing Equipment
- Mud Removal: The Most Important Factor
- Centralisation and Stand-Off
- Surface Equipment: Cementing Unit, Bulk System and Cement Head
- Plugs and Float Equipment
- Stage Tools and Liner Hangers
- 6
Executing the Job
- Pre-Job Checks and Rig-Up
- The Primary Cementing Job Sequence
- Real-Time Monitoring and the Job Report
- Health, Safety and Environment on a Cementing Job
- Wait on Cement and Pressure Tests
- 7
Evaluation, Remedial Cementing and Lessons Learned
- Cement Bond Log and Variable Density Log
- Ultrasonic and Temperature Logs
- Squeeze Cementing
- Balanced Cement Plugs for Sidetrack and Abandonment
- Common Cementing Failures
- Lessons from the Macondo Cement Job
Esta página describe lo que suele abarcar la formación. Cada proveedor de formación puede cambiar el contenido, la duración y el orden para adaptarlos al grupo. Confirme el contenido final con el proveedor de formación antes de reservar.
¿Prefiere aprender a su ritmo?
El mismo tema en un curso en línea que puede empezar hoy.

Cementing Operations
7 h 46 min
Más cursos: Petróleo y gas
Otros cursos con formador de la misma área temática.
Reseñas
Lo que dicen los participantes sobre Cementing Operations.
Todavía no hay reseñas
Sea la primera persona en contar cómo fue Cementing Operations.
Inicie sesión para escribir una. Revisamos todas las reseñas antes de mostrarlas.
Reservar ahora
¿Es lo que buscaba?
Póngase en contacto con nuestro equipo para consultar el curso y la disponibilidad de plazas en la ubicación que prefiera
Reservar ahora
