Kanban and Pull Systems
A practical introduction to kanban for materials and operations, for production, warehouse, maintenance-stores and supply staff and their supervisors. Learn how pull differs from push, the types of pull and kanban signal, the rules of kanban, supermarkets and first-in, first-out (FIFO) lanes, how to size a loop with the kanban formula and Little’s law, and how to design and run two-bin systems for consumables and spares and kanban with suppliers. It ends with auditing and recalculating loops and starting with a pilot; Kanban boards for project teams are covered in Agile Project Delivery.
- Modules
- 6
- Participants max.
- 20
- Langue
- EN
Ce qu'elle couvre habituellement
- 1
Push, Pull and Why Kanban Works
- What Kanban Means for Materials and Operations
- Push Versus Pull
- Why Pull Limits Overproduction and Work in Progress
- Little’s Law and WIP Limits
- When Pull Fits and When It Does Not
- 2
Types of Pull and Kanban Signals
- Replenishment Pull and the Supermarket
- Sequential Pull
- Mixed Pull Systems
- Production and Withdrawal Kanban
- Supplier, Signal and Electronic Kanban
- 3
Running the Loop: Rules, Supermarkets and FIFO Lanes
- The Six Rules of Kanban
- Laying Out a Supermarket
- FIFO Lanes Between Processes
- Collecting Cards and Moving Material
- CONWIP: Capping the Work in a Whole Line
- 4
Sizing a Kanban Loop
- The Data a Kanban Loop Needs
- The Kanban Formula Worked Step by Step
- Variants of the Kanban Formula
- Container Size and the Trade-offs
- Levelling with a Heijunka Box
- 5
Two-Bin Systems and Supplier Kanban
- How a Two-Bin System Works
- Sizing and Labelling Bins for Consumables
- Two-Bin for Maintenance Spares and Stores
- Kanban with Suppliers
- Running the Daily Two-Bin and Kanban Routine
- 6
Keeping Kanban Working: Audits, Recalculation and a Pilot Loop
- Signs a Kanban System Is Failing
- Auditing a Kanban Loop
- Recalculating and Removing Cards
- Starting Small: Choosing a Pilot Loop
- Running the Pilot and Spreading Pull
Cette page décrit ce que la formation couvre habituellement. Chaque prestataire de formation peut modifier le contenu, la durée et l'ordre pour s'adapter au groupe. Confirmez le contenu final avec le prestataire de formation avant de réserver.
Vous préférez apprendre à votre rythme ?
Le même sujet en cours en ligne, à commencer dès aujourd'hui.

Kanban et systèmes à flux tiré
4 h 23 min
Autres cours : Management de la qualité
Autres cours avec un formateur dans le même domaine.
Avis
Ce que les apprenants disent de Kanban and Pull Systems.
Pas encore d'avis
Soyez la première personne à dire ce que vous avez pensé de Kanban and Pull Systems.
Connectez-vous pour en rédiger un. Nous vérifions chaque avis avant de l'afficher.
Réserver
Est-ce ce que vous cherchiez ?
Contactez notre équipe pour vérifier la disponibilité du cours et des places dans le lieu de votre choix
Réserver


