Kanban and Pull Systems
A practical introduction to kanban for materials and operations, for production, warehouse, maintenance-stores and supply staff and their supervisors. Learn how pull differs from push, the types of pull and kanban signal, the rules of kanban, supermarkets and first-in, first-out (FIFO) lanes, how to size a loop with the kanban formula and Little’s law, and how to design and run two-bin systems for consumables and spares and kanban with suppliers. It ends with auditing and recalculating loops and starting with a pilot; Kanban boards for project teams are covered in Agile Project Delivery.
- Módulos
- 6
- Máximo de participantes
- 20
- Idioma
- EN
Qué suele abarcar
- 1
Push, Pull and Why Kanban Works
- What Kanban Means for Materials and Operations
- Push Versus Pull
- Why Pull Limits Overproduction and Work in Progress
- Little’s Law and WIP Limits
- When Pull Fits and When It Does Not
- 2
Types of Pull and Kanban Signals
- Replenishment Pull and the Supermarket
- Sequential Pull
- Mixed Pull Systems
- Production and Withdrawal Kanban
- Supplier, Signal and Electronic Kanban
- 3
Running the Loop: Rules, Supermarkets and FIFO Lanes
- The Six Rules of Kanban
- Laying Out a Supermarket
- FIFO Lanes Between Processes
- Collecting Cards and Moving Material
- CONWIP: Capping the Work in a Whole Line
- 4
Sizing a Kanban Loop
- The Data a Kanban Loop Needs
- The Kanban Formula Worked Step by Step
- Variants of the Kanban Formula
- Container Size and the Trade-offs
- Levelling with a Heijunka Box
- 5
Two-Bin Systems and Supplier Kanban
- How a Two-Bin System Works
- Sizing and Labelling Bins for Consumables
- Two-Bin for Maintenance Spares and Stores
- Kanban with Suppliers
- Running the Daily Two-Bin and Kanban Routine
- 6
Keeping Kanban Working: Audits, Recalculation and a Pilot Loop
- Signs a Kanban System Is Failing
- Auditing a Kanban Loop
- Recalculating and Removing Cards
- Starting Small: Choosing a Pilot Loop
- Running the Pilot and Spreading Pull
Esta página describe lo que suele abarcar la formación. Cada proveedor de formación puede cambiar el contenido, la duración y el orden para adaptarlos al grupo. Confirme el contenido final con el proveedor de formación antes de reservar.
¿Prefiere aprender a su ritmo?
El mismo tema en un curso en línea que puede empezar hoy.

Kanban y sistemas de arrastre
4 h 23 min
Más cursos: Gestión de la calidad
Otros cursos con formador de la misma área temática.
Reseñas
Lo que dicen los participantes sobre Kanban and Pull Systems.
Todavía no hay reseñas
Sea la primera persona en contar cómo fue Kanban and Pull Systems.
Inicie sesión para escribir una. Revisamos todas las reseñas antes de mostrarlas.
Reservar ahora
¿Es lo que buscaba?
Póngase en contacto con nuestro equipo para consultar el curso y la disponibilidad de plazas en la ubicación que prefiera
Reservar ahora


