Cementing Operations
A practical intermediate course in primary and remedial well cementing for cementing crews, service technicians, drilling engineers, drilling supervisors and well integrity staff. It covers oilwell cement to API Spec 10A, slurry design and additives, laboratory testing to API RP 10B, volume and pressure calculations, mud removal and centralisation, equipment and the job sequence, cement evaluation, squeezes and balanced plugs, and common failures including the lessons of the Macondo cement job.
- Модули
- 7
- Макс. участников
- 20
- Язык
- EN
Что обычно входит
- 1
Primary Cementing and the Well
- Why We Cement a Well
- Casing Cement as a Well Barrier Element
- Casing Strings and Their Cement Jobs
- Pressures That Shape a Cement Job
- Who Does What on a Cement Job
- 2
Oilwell Cement and Slurry Properties
- Portland Cement and Hydration
- API Spec 10A Classes and Grades
- Density, Yield and Mix Water
- Thickening Time, Strength, Fluid Loss and Free Water
- Rheology of Cement Slurries
- 3
Additives and Laboratory Testing
- Accelerators and Retarders
- Extenders and Weighting Agents
- Fluid Loss, Dispersants and Lost Circulation Materials
- Gas Migration Control
- Laboratory Testing to API RP 10B
- 4
Job Planning and Calculations
- Capacities of Pipe, Hole and Annulus
- Slurry Volume: Excess, Lead, Tail and Shoe Track
- Displacement Volume and the Plug Bump
- Pressures During the Job: ECD and U-Tubing
- Spacers and Washes
- 5
Mud Removal and Cementing Equipment
- Mud Removal: The Most Important Factor
- Centralisation and Stand-Off
- Surface Equipment: Cementing Unit, Bulk System and Cement Head
- Plugs and Float Equipment
- Stage Tools and Liner Hangers
- 6
Executing the Job
- Pre-Job Checks and Rig-Up
- The Primary Cementing Job Sequence
- Real-Time Monitoring and the Job Report
- Health, Safety and Environment on a Cementing Job
- Wait on Cement and Pressure Tests
- 7
Evaluation, Remedial Cementing and Lessons Learned
- Cement Bond Log and Variable Density Log
- Ultrasonic and Temperature Logs
- Squeeze Cementing
- Balanced Cement Plugs for Sidetrack and Abandonment
- Common Cementing Failures
- Lessons from the Macondo Cement Job
На этой странице описано, что обычно входит в обучение. Каждый провайдер обучения может менять содержание, продолжительность и порядок тем под конкретную группу. Перед бронированием уточните окончательное содержание у провайдера обучения.
Удобнее учиться в своём темпе?
Та же тема в онлайн-курсе, который можно начать сегодня.

Cementing Operations
7 ч 46 мин
Ещё в категории «Нефть и газ»
Другие курсы с тренером по той же теме.
Отзывы
Что говорят учащиеся о курсе «Cementing Operations».
Отзывов пока нет
Расскажите первыми, как это было: Cementing Operations.
Войдите, чтобы написать отзыв. Мы проверяем каждый отзыв перед публикацией.
Записаться
Это то, что вы искали?
Свяжитесь с нами, чтобы уточнить наличие курса и мест в нужном вам городе
Записаться
