Temporary Pipework Safety
An awareness course for rig crews, well service crews, plant operators and supervisors who rig up, pressure test, work near or rig down temporary high-pressure pipework and hoses. It covers how pressurised lines injure people, the components and hammer unions including the 2 inch Fig 602 and Fig 1502 mismatch, ratings and inspection, restraints, pressure testing, safe operation, proving zero pressure and rig-down. It does not qualify anyone to design, inspect or certify pressure equipment; ratings, test pressures and intervals always come from the manufacturer and company procedure.
- Модули
- 7
- Макс. участников
- 20
- Язык
- EN
Что обычно входит
- 1
Temporary Pipework and Why It Hurts People
- What Temporary Pipework Is and Where It Is Used
- Stored Pressure Energy: Liquid and Gas
- How Temporary Pipework Injures People
- What Attacks the Line: Erosion, Corrosion, Vibration and Shock
- Roles, Responsibilities and Stop Work
- 2
Components of a Temporary Line
- Straights, Pup Joints, Elbows and Swivel Joints
- Tees, Laterals, Crossovers and Blanked Outlets
- Plug Valves, Check Valves and Chokes
- Pressure Relief Valves, Gauges and Sensors
- Flexible High-Pressure Hoses
- 3
Hammer Unions and Other Connections
- The Parts of a Hammer Union
- Figure Numbers, Ratings and Colour Coding
- The 2 Inch Fig 602 and Fig 1502 Mismatch
- Other Mismatches and How to Prevent Them
- Threaded, Integral, Flanged and Hub Connections
- 4
Ratings, Identification and Inspection
- Working Pressure, Test Pressure and the Weakest Component
- Temperature and Service: Standard, Sour and Abrasive
- Identification, Banding and Certification
- Pre-Use Inspection and Rejection Criteria
- 5
Rigging Up the Line
- Planning the Layout
- Supports, Restraints and Anchoring
- Making Up Hammer Unions Safely
- Walking the Line Before Pressure
- 6
Pressure Testing, Operating and Rigging Down
- Preparing a Pressure Test
- Running the Test: Stages, Hold and Records
- Operating: Line of Fire, Monitoring and Leaks
- Depressurising and Proving Zero Energy
- Rig-Down, Cleaning and Storage
- 7
Putting It Together: Cases and the Complete Job
- Case: A Mismatched Union on a Cementing Line
- Case: A Washout During Flowback
- Case: Trapped Pressure at Rig-Down
- The Complete Job, Start to Finish
На этой странице описано, что обычно входит в обучение. Каждый провайдер обучения может менять содержание, продолжительность и порядок тем под конкретную группу. Перед бронированием уточните окончательное содержание у провайдера обучения.
Удобнее учиться в своём темпе?
Та же тема в онлайн-курсе, который можно начать сегодня.

Temporary Pipework Safety
4 ч 18 мин
Ещё в категории «Нефть и газ»
Другие курсы с тренером по той же теме.
Отзывы
Что говорят учащиеся о курсе «Temporary Pipework Safety».
Отзывов пока нет
Расскажите первыми, как это было: Temporary Pipework Safety.
Войдите, чтобы написать отзыв. Мы проверяем каждый отзыв перед публикацией.
Записаться
Это то, что вы искали?
Свяжитесь с нами, чтобы уточнить наличие курса и мест в нужном вам городе
Записаться
