Логотип iCompetent
В классе · С преподавателемOil & GasНачальныйСертификат

Temporary Pipework Safety

An awareness course for rig crews, well service crews, plant operators and supervisors who rig up, pressure test, work near or rig down temporary high-pressure pipework and hoses. It covers how pressurised lines injure people, the components and hammer unions including the 2 inch Fig 602 and Fig 1502 mismatch, ratings and inspection, restraints, pressure testing, safe operation, proving zero pressure and rig-down. It does not qualify anyone to design, inspect or certify pressure equipment; ratings, test pressures and intervals always come from the manufacturer and company procedure.

Модули
7
Макс. участников
20
Язык
EN

Что обычно входит

  1. 1

    Temporary Pipework and Why It Hurts People

    • What Temporary Pipework Is and Where It Is Used
    • Stored Pressure Energy: Liquid and Gas
    • How Temporary Pipework Injures People
    • What Attacks the Line: Erosion, Corrosion, Vibration and Shock
    • Roles, Responsibilities and Stop Work
  2. 2

    Components of a Temporary Line

    • Straights, Pup Joints, Elbows and Swivel Joints
    • Tees, Laterals, Crossovers and Blanked Outlets
    • Plug Valves, Check Valves and Chokes
    • Pressure Relief Valves, Gauges and Sensors
    • Flexible High-Pressure Hoses
  3. 3

    Hammer Unions and Other Connections

    • The Parts of a Hammer Union
    • Figure Numbers, Ratings and Colour Coding
    • The 2 Inch Fig 602 and Fig 1502 Mismatch
    • Other Mismatches and How to Prevent Them
    • Threaded, Integral, Flanged and Hub Connections
  4. 4

    Ratings, Identification and Inspection

    • Working Pressure, Test Pressure and the Weakest Component
    • Temperature and Service: Standard, Sour and Abrasive
    • Identification, Banding and Certification
    • Pre-Use Inspection and Rejection Criteria
  5. 5

    Rigging Up the Line

    • Planning the Layout
    • Supports, Restraints and Anchoring
    • Making Up Hammer Unions Safely
    • Walking the Line Before Pressure
  6. 6

    Pressure Testing, Operating and Rigging Down

    • Preparing a Pressure Test
    • Running the Test: Stages, Hold and Records
    • Operating: Line of Fire, Monitoring and Leaks
    • Depressurising and Proving Zero Energy
    • Rig-Down, Cleaning and Storage
  7. 7

    Putting It Together: Cases and the Complete Job

    • Case: A Mismatched Union on a Cementing Line
    • Case: A Washout During Flowback
    • Case: Trapped Pressure at Rig-Down
    • The Complete Job, Start to Finish

На этой странице описано, что обычно входит в обучение. Каждый провайдер обучения может менять содержание, продолжительность и порядок тем под конкретную группу. Перед бронированием уточните окончательное содержание у провайдера обучения.

Код
Тип
В классе
Модули
7
Уровень
Начальный
Язык
EN
Макс. участников
20
Сертификат
Да
Оценка
Нет

Удобнее учиться в своём темпе?

Та же тема в онлайн-курсе, который можно начать сегодня.

Temporary Pipework Safety

4 ч 18 мин

БесплатноОткрыть курс

Ещё в категории «Нефть и газ»

Другие курсы с тренером по той же теме.

Отзывы

Что говорят учащиеся о курсе «Temporary Pipework Safety».

Отзывов пока нет

Расскажите первыми, как это было: Temporary Pipework Safety.

Войдите, чтобы написать отзыв. Мы проверяем каждый отзыв перед публикацией.

Записаться

Это то, что вы искали?

Свяжитесь с нами, чтобы уточнить наличие курса и мест в нужном вам городе

Записаться
Image for the book now section

Запросить расчёт