Operating Discipline & Shift Handover
How to hand over a shift so nothing is lost between crews — the written and verbal handover, plant status and abnormal line-ups, live permits, overrides and inhibits, log-keeping discipline and the fatigue that makes shift change the weakest moment of the day. For operators, technicians, supervisors and anyone who takes or gives control of running plant.
50m
Общее время
4
Уровни компетенций
12
Уроки
Чему вы научитесь
- Explain why incomplete shift handover is a recurring contributor to major process incidents.
- Describe the principles of an effective handover: written plus verbal, face to face, two-way questioning, protected overlap time.
- Apply a structured handover checklist covering plant status, abnormal line-ups, live permits, overrides and inhibits, ongoing jobs and standing instructions.
- Keep contemporaneous, factual operating logs and maintain an accurate override and inhibit register.
- Recognise how fatigue and time pressure at shift change degrade communication, and apply countermeasures.
- Assess and improve handover quality across a team, treating operating discipline as a leadership responsibility.
Программа
Проходите уровни компетенций по порядку.
1
Awareness
- 3mWhy Handover Goes WrongЗнания
- 3mPrinciples of a Good HandoverЗнания
- 5mAwareness Check: Why Handover MattersОценка
2
Knowledge
- 3mWhat Must Always Be Handed OverЗнания
- 3mLogs, Registers and the Written RecordЗнания
- 7mKnowledge Check: Content and RecordsОценка
3
Skill
- 3mRunning the Handover: Sequence and FatigueЗнания
- 3mAssignment: Give and Document a Structured HandoverЗадание
- 7mSkill Check: Doing the HandoverОценка
4
Mastery
- 3mOperating Discipline as a Leadership DutyЗнания
- 3mAssignment: Audit and Improve Handover QualityЗадание
- 7mMastery Assessment: Sustaining Operating DisciplineОценка
Ready to build Operating Discipline & Shift Handover?
Создайте бесплатный аккаунт на iCompetent и начните проходить уровни уже сегодня.