Spare Parts & Materials Management
Managing spares as a reliability control rather than a stores chore: criticality-driven stocking policies, clean material master data, interchangeability and equivalents, rotable repair loops, preservation of stored items, obsolescence planning and reservations that keep planned jobs supplied. For materials, warehouse, planning, maintenance and reliability people.
55m
Общее время
4
Уровни компетенций
12
Уроки
Чему вы научитесь
- Explain why spares availability is a reliability outcome, not just a stores performance measure
- Classify spares by criticality and select the stocking policy that fits each class
- Judge the quality of a material master record and describe what poor data costs the plant
- Apply interchangeability rules and manage rotables through a closed repair-and-return loop
- Specify preservation and shelf-life controls for stored spares and verify they are being applied
- Plan for obsolescence with OEMs and reserve materials so planned jobs are never short
Программа
Проходите уровни компетенций по порядку.
1
Awareness
- 3mSpares Are a Reliability Problem, Not a Stores ProblemЗнания
- 3mCriticality Drives the Stocking PolicyЗнания
- 7mAwareness Check: Criticality and ConsequenceОценка
2
Knowledge
- 3mMaterial Master Data and What Bad Data CostsЗнания
- 3mInterchangeability, Equivalents and the Rotable LoopЗнания
- 8mKnowledge Check: Data, Equivalents and RotablesОценка
3
Skill
- 3mPreservation in Store and Serving the PlanЗнания
- 3mAssignment: Spares Health Check on a Critical AssetЗадание
- 8mSkill Check: Preservation and Availability JudgementОценка
4
Mastery
- 3mObsolescence, End of Life and Owning the Spares PortfolioЗнания
- 3mAssignment: Obsolescence and Insurance Spare ReviewЗадание
- 8mMastery Assessment: Spares Strategy Under PressureОценка
Ready to build Spare Parts & Materials Management?
Создайте бесплатный аккаунт на iCompetent и начните проходить уровни уже сегодня.